part of

What
  • 6,5 m² green textile
  • In frame with keder
Instalation specifics
  • Installed June 2019
  • 0.5 day installation
  • Directly attached to concrete industrial panel
Partners
  • Substrate: GreenTecStyle® by Sioen
  • Frame profiles: Vermako NV
  • Watering system: Mastop BV
  • Plants: Denis Plants BVBA
  • Installation: Vermako NV
  • Engineering: Vermako NV & Coatex NV
  • Maintenance: Coatex NV